• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Roads and Infrastructure Project in Al Wajba East (Pkg 1)

Brief description

The project aims to serve 388 citizens’ sub-divisions in Al-Wajba East through implementing a roads network to enhance the traffic flow and provide connection with the future public facilities in the area. This is in addition to providing traffic safety elements and implementing infrastructure works.

Benefits

The project aims to serve 388 citizens' sub-divisions in Al-Wajba East through implementing a roads network to enhance the traffic flow and provide connection with the future public facilities in the area. This is in addition to providing traffic safety elements and implementing infrastructure works.

The project includes:

  • A roads network with a total length of 17 km

  • Road safety features including street lighting & road signs and marking

  • a 34 km-long pedestrian and cycle lanes

  • 2570 car parking bays

  • 14 km-long foul sewer network

  • 16.6 km surface and groundwater drainage network

  • 10.7 km Treated Sewerage Effluent (TSE) network

extending potable water pipes and connecting them to the main drinking water network

Project Information
Geographical Location N/A
Area Al Wajba
Sector Infrastructure Projects
Total Cost 263,000,000 Q.R.
Status In progress
Type Drainage
Start Date 15 September 2020
Expected completion date First quarter of 2024
Construction company

​Galfar Al Misnad Engineering and Contracting Company

Consulting company N/A